Customization: | Available |
---|---|
Feature: | Biodegradable |
CAS No.: | 9002-81-7 |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description | Applications | |||||
·Good dimensional stability | · Injection molding | |||||
· Excellent heat stability | ·Good mechanical properties balance | |||||
Properties | Test Method | Test Condition | Unit | Typical Values | ||
Specific Gravity | ISO 1183 | 23ºC | g/cm3 | 1.41 | ||
MI | ISO 1183 | g/10min | 9 | |||
Ash | ISO 3451 | 800ºC,30min | % | 0 | ||
Mechanical properties | ||||||
Tensile Strength | ISO 527 | 50mm/min | MPa | 63 | ||
(Fracture) elongation | ISO 527 | 50mm/min | % | 33 | ||
Flexural Modulus | ISO 178 | 2mm/min | MPa | 2500 | ||
Mold Shrinkage | Internal test method | ºC | 1.8-2.2 | |||
Hardness | --- | --- | 75M | |||
Bending Strength | ISO 178 | 23ºC | MPa | 87 | ||
Notched Charpy Impact strength |
ISO 179/1eA | 23ºC | KJ/m2 | 6 | ||
Other properties | ||||||
Note: The data above is a typical value for reference, not a guaranteed value. The data will vary with tool design such as gate type, gate location, gate number, injection molding process, and part thickness. The data will vary with different colors as well. Prior to using the material, please consult with TOPO NEW Material Co., Ltd. | ||||||
Processing Conditions | Range | |||||
Melt Temperature | 230-250ºC | |||||
Mold Temperature | 60-100ºC | |||||
Pre-Dry needed | 90ºC, 3-4h | |||||
Note: The above process condition is only for reference. The actual process should be adjusted according to different types of machines, mold designs, and product designs. |
Certification:
Our warehouse:
Other products:
1. Are you trading company or Manufacturer ?
We are factory.
2.About Sample
We provide samples, but you need to pay the freight.
3. About Material
We can customize the material according to customers' requirement.
4. About Quality
All the products must be tested strictly according to the testing procedure before shipment.
5. About Delivery Period
Normally delivered in 7-15 working days after the confirmation of order& payment. And it varies according to the material and quantity.